Over 3 years of experience as Asst E&I Engineer in oil & gas other projects.
Good knowledge of electrical and plant instrumentation.
Ability to manage team work .
Good interpersonal skills and ability to communicate effectively.
Project: KUNNAR POWER DEVELOPMENT TANDO ALLAHYAR (OGDCL PAKISTAN)
Ø Installation of cable tray as per drawing.
Ø Installation of Field instruments.
Ø Installation of F&G devices.
Ø Loop Checking(Hot & cold Loop).
Ø .Cable laying , Glanding & Termination.
Ø Documentation for all site Activities.
Good Awareness of Drawing:
Ø P & I Drawings.
Ø Isometric Drawings.
Ø GA Drawings of Skids.
Ø Instrument Loop Circuit Diagram.
Ø Instrument location layout.
Ø Hook up Diagram.
Projects:
Basanti 400 TPD Solvent Extraction Plant. (Sheikhupura Road Mureedke). ·
Installation, testing & commissioning of LV Panels.·
Installation of cable tray as per electrical cable route drawing.·
Installation, testing & commissioning of earthling system.·
Installation, testing, termination & commissioning of lightening system for flood light, boundary wall light & beacon light on chimney as per lightening layout drawing.·
Installation, testing, termination & commissioning of lightening system including indoor lightening, indoor DBs, wiring system, split air conditioning etc.·
Responsible to arrange electrical installation and get approval from client electrical inspector.· Conduct electrical progress work inspections on daily basis.·
Coordinate with Client Electrical Engineers to solve drawing as well as set-route problems.· Responsible to daily schedule of cable laying, glanding and termination as per cable schedule.
Up gradation Of Multan International Airport.·
Installation of MAHU, AHU, FCU, Exhaust fan, Split air Conditioner and Air curtain as per Shop drawings.· Installation of LV Panels and ACP (Apparatus Control Panels).·
Scheduling of Cable lying and termination as per cable schedule.·
Testing and commissioning of LV Panels, drives and pumps.·
Submittal Shop drawings after completion of project.·
Scheduling of cable tray and conduit routes as per drawing.·
Coordinating with the B.M.S control system.
.Three phase remote facility gas separator at “Presson Descon International (pvt) Ltd”
Installation of pressure switches, recorders, level controller as per hook-up drawings.·
Installation of pressure switches, recorders, level controller as per hook-up drawings.·
Testing and purging of pressure switches, recorders, level controller.
Primary and Secondry cable laying,Glanding and termination from junction box to instrument site
BE ELECTRICAL MAJORS IN ELECTRONICS .
REGISTERED ENGINEER FROM PAKISTAN ENGINEERING COUNCIL (PEC).
3 year diploma of associate engineer in Electrical.
matriculation in science .
Automatic Object Sorting and Color sensing through Image Processing.
Automatic Object Sorting and Color sensing through Image Processing.
Automatic Object Sorting and Color sensing through Image Processing.