Project: The HIVE Tower Huawei Project at Islamabad.
It is a nine floor high rise building with ground floor and two basements. we are providing complete system of HVAC, Electrical, ELV, Firefighting and plumbing.
Job Responsibilities: At this project my responsibilities are
Understanding technical and feasibility studies, site investigation planning & managing.
Supervising construction activities & coordination among client, consultant & subcontractors.
Effective and timely correspondence with all stakeholders. Compiling and checking reports.
Correction of any project deficiencies & look after works as per drawings with quality standard.
Thinking both creatively and logically to resolve design and execution problems.
Project: Peshawar General Hospital.
It was the project where I have to oversee the overall project which starts from Planning, Execution, Controlling and monitoring to the successful Closing of the project.
Job Responsibilities:During this project I was supervising the following development
Projects: Faisalabad International Airport & New Islamabad International Airport Pakistan
This Project included 11KV substation, 2 step down transformer 500 KVA, LT panels with three 500KVA load sharing generators. We provide the complete system of flight inquiry display system, CCTV, Public Addres system, Fire alarm system, Telephone,HVAC,Networking,Air field lighting (AGL type), Elevators and escalators etc.
This project consist on 11kv cargo substation,17 kiosk type substation,17 DG sets with ATS panels, 10 Ring Main Units, medium voltage cable direct burried 26km & low voltage cable aprox 175km for power up all security watch towers & 118 fence lighting poles.
Job Responcibilities:In these two projects I was supervising the following developments
Project: Fathima Jinnah Wommen University Islamabad Pakistan (USAID Project).
It was the USA funded project. The purpose was to construct IT and emerging sciences block for university students , includes highly equipped IT and science labs from modern era science equipments.Project include 700KVA transformer, LV panels, CCTV,Fire alarm,PA system.
Job Responcibilities:
Changhong is the china largest consumer electronics and home appliances manufacturer with a presence in more than 110 countries has shaken hands in collaboration with Ruba group of companies Pakistan to launch its co-brands “CHANG HONG RUBA”, its featured products are Air conditioning, refrigerators, LEDs, Water dispenser, microwave oven, sound systems etc
. Job Responcibilities: Here my responcibilities were following
This was the project designed to have power production capacity of total 81MW to feed local industries as well as fulfill country power shortage .it includes three separate Francis type hydal turbine each one producing 27MW as total power production is 81MW. In this project I was working as a Trainee Electrical Engineer.
Job Responcibilities My responsibility was assisting of Operation and maintenance Engineer during shutdown Period of power Plant.
PROJECT: Oil and Gas exploration in Sindh Province Pakistan
Job Responcibilities In this project my resposibilities were following
Cc
Succesfully completed cource and get high grades in all subjects.
Awarded as best employee of the year by company as finishing the project in allocated budget and before time.